リアルタイム位置情報システム(RTLS)市場の世界予測 – MarketsandMarkets



リアルタイム位置情報システム(RTLS)市場 : ハードウェア (タグ&バッジ、リーダー&トラッカー)、テクノロジー (RFID、Wi-Fi、UWB、BLE、赤外線、超音波、GPS、Zigbee)、用途 (在庫&資産追跡、個人監視)、垂直、地域別 – 2028年までの世界予測
Real-time Location Systems Market by Hardware (Tags/Badges, Readers/Trackers), Technology (RFID, Wi-Fi, UWB, BLE, Infrared, Ultrasound, GPS, Zigbee), Application (Inventory/Asset Tracking, Personnel Monitoring), Vertical, Region – Global Forecast to 2028

レポートのお問合せ

リアルタイム位置情報システム(RTLS)市場 : ハードウェア (タグ&バッジ、リーダー&トラッカー)、テクノロジー (RFID、Wi-Fi、UWB、BLE、赤外線、超音波、GPS、Zigbee)、用途 (在庫&資産追跡、個人監視)、垂直、地域別 – 2028年までの世界予測 Real-time Location Systems Market by Hardware (Tags/Badges, Readers/Trackers), Technology (RFID, Wi-Fi, UWB, BLE, Infrared, Ultrasound, GPS, Zigbee), Application (Inventory/Asset Tracking, Personnel Monitoring), Vertical, Region – Global Forecast to 2028

The global real-time location systems market size is expected to grow from USD 5.2 billion in 2023 to USD 16.2 billion by 2028, at a CAGR of 25.5% from 2023 to 2028. The increasing demand for RTLS is attributed to the growing need for real-time visibility and tracking of assets and people in various industries. Also, the increased need for safety and security in industries contributes to the increasing deployment of RTLS in multiple verticals such as healthcare, education, defense, oil & gas, manufacturing, and others.

リアルタイム位置情報システム(RTLS)市場 : ハードウェア (タグ&バッジ、リーダー&トラッカー)、テクノロジー (RFID、Wi-Fi、UWB、BLE、赤外線、超音波、GPS、Zigbee)、用途 (在庫&資産追跡、個人監視)、垂直、地域別 – 2028年までの世界予測 Real-time Location Systems Market by Hardware (Tags/Badges, Readers/Trackers), Technology (RFID, Wi-Fi, UWB, BLE, Infrared, Ultrasound, GPS, Zigbee), Application (Inventory/Asset Tracking, Personnel Monitoring), Vertical, Region – Global Forecast to 2028

Major players profiled in this report are as follows: Securitas AB (Sweden), Zebra Technologies Corporation (US), Aruba Networks (US), Impinj, Inc. (US), Savi Technology (US), TeleTracking Technologies, Inc. (US), CenTrak, Inc. (US), GE HealthCare Technologies Inc. (US), Ubisense Ltd. (UK), Alien Technology, LLC (US), AiRISTA Flow, Inc. (US), Sonitor Technologies (US), Midmark Corporation (US), and others.

関連記事